Chandrayan 2

 Chandrayan 2


 
Mission typeLunar orbiterlanderrover
OperatorIndian Space Research Organisation (ISRO)
COSPAR ID2019-042A
SATCAT no.44441
Websitewww.isro.gov.in/chandrayaan2-home-0
Mission duration
  • Orbiter: ~ 7.5 years (planned);
    1 year, 10 months, 1 day (elapsed)
  • Vikram lander: ≤ 14 days (planned);[1][2]
    0 days (landing failure)
  • Pragyan rover: ≤ 14 days (planned);[2]
    0 days (landing failure)
Spacecraft properties
ManufacturerIndian Space Research Organisation (ISRO)
Launch massCombined (wet): 3,850 kg (8,490 lb) [3][4][5]
Combined (dry): 1,308 kg (2,884 lb) [6]
Orbiter (wet): 2,379 kg (5,245 lb) [4][5]
Orbiter (dry): 682 kg (1,504 lb) [6]
Vikram lander (wet): 1,471 kg (3,243 lb) [4][5]
Vikram lander (dry): 626 kg (1,380 lb)[6]
Pragyan rover: 27 kg (60 lb) [4][5]
PowerOrbiter: 1000 watts [7]
Vikram lander: 650 watts [8]
Pragyan rover: 50 watts
Start of mission
Launch date22 July 2019, 09:13:12 UTC[9]
RocketGSLV Mark III M1 [10][11]
Launch siteSatish Dhawan Space Centre Second Launch Pad
ContractorIndian Space Research Organisation (ISRO)
Moon orbiter
Orbital insertion20 August 2019, 03:32 UTC [12][13]
Orbital parameters
Pericynthion altitude100 km (62 mi) [14]
Apocynthion altitude100 km (62 mi)
Moon lander
Spacecraft componentRover
Landing date6 September 2019, 20:23 UTC [13][15]
Landing siteLunar south pole (intended)

Ankit Singh 13

Hi guys myself The Ankit Singh I have a good content related to interesting and famous topics. I hope so you like to read it ��. And I request if possible please share the blog �� and follow me �� Thank you ��

Post a Comment

Previous Post Next Post